Kitchen Renovation
A kitchen renovation that connects every decision.
Planning a kitchen renovation in Washington? Review the existing room, desired result and budget before committing to cabinets, counters or a new layout.

Cabinets, counters, islands and lighting from recent kitchen projects. Swipe or use the arrows to browse more.
















Explore all 23 services, from cabinets and countertops to full remodels.
A kitchen renovation that connects every decision.
Change how the kitchen works, as well as how it looks.
A kitchen plan drawn around your daily routines.
Cabinetry planned for the storage you actually need.
New cabinet fronts, with a careful look at what stays.
A cabinet finish refresh with preparation at its center.
Quartz counters, fitted to the cabinets and the way you prepare food.
Select the slab, then plan how it fits the room.
An island that earns its place in the kitchen.
A backsplash planned around the details on the wall.
Kitchen flooring starts with what is underneath.
Light the work surfaces, then shape the room.
A sink and faucet that fit the opening and the routine.
Resolve the connections before closing in the kitchen.
Open the room only after understanding the wall.
A galley kitchen with a clear path through the work.
Make a small kitchen work harder, without crowding it.
A condo kitchen plan that includes the building.
A considered kitchen, with the details resolved together.
Spend first on the changes that solve the problem.
A kitchen designed around the person using it.
Plan the outdoor kitchen for its exposure and connections.
Confirm the fit and connections before delivery day.
The 2020–2024 ACS estimate for the matched housing area gives a median construction year of 1958. This is a community estimate, not the age of every home or a survey of kitchen condition.
For a home in this age bracket, separate layout concerns from worn finishes. A closed kitchen can sometimes work well after cabinetry and lighting changes. An open plan is another option after assessment; the census housing era does not establish that wall removal is needed.
The matched ACS building-type estimates are 32.71% single-family structures; 67.19% buildings with two or more housing units; 0.08% mobile/manufactured housing category. Building type does not identify ownership rules or confirm the construction of your property.
Housing context: U.S. Census ACS 2020–2024 five-year tables, matched to Washington city, District of Columbia. Estimates describe the mapped area, with sampling uncertainty.
For an actual pre-1978 home, discuss applicable lead-safe renovation requirements before disturbing painted surfaces. The area housing median is a reason to ask about the property, not evidence that a particular cabinet contains lead. See EPA consumer renovation guidance.
Before removing an older floor or ceiling finish, discuss whether suspect materials need professional assessment. Do not identify asbestos by appearance or disturb it to investigate. The area’s age estimate does not confirm that it is present. Read EPA guidance on asbestos in homes.
Humid climate context makes moisture management worth including in the conversation. Inspect the actual sink area and ventilation arrangement. Choose cabinetry and finishes using their specifications; no material label alone guarantees protection from a leak or unsuitable installation.
The matched housing estimate places 67.19% of units in buildings with two or more units. This is a building-type measure, not a condo ownership percentage. If your property has association or management rules, obtain the current requirements for work hours, deliveries and shared services before scheduling. Review access for large components and confirm who handles any reservations or approvals.
The matched ACS median home value is $737,100, equal to the supplied state median of $737,100. These are housing-value estimates, not a remodeling return forecast. Review a higher-specification option alongside the simpler design that meets the same priorities. Include care and replacement access as well as appearance. The housing-value comparison offers context, while actual condition and household use should guide the selection.
Follow the route from meal preparation to serving and cleanup. Where does waste go? Can dishes be moved from the dishwasher to storage without crossing the cooking area? Do groceries have a clear landing point? A layout can look efficient in a diagram but work awkwardly once those tasks overlap. Compare the selected plan against an ordinary busy evening, including another person passing through the room.
Ask which fittings, isolation components and accessories are included and who completes any countertop work. Confirm testing and return-to-use requirements. If an existing connection is unsuitable, document the additional work before it becomes a surprise during fitting. The installation estimate should describe a functioning assembly rather than only setting the new fixture in place.
Start with how the household cooks, stores food and cleans up. Identify the points where those activities conflict and the components that still work. A new finish can change the appearance without resolving poor access. Put the functional priorities into the brief before comparing cabinet styles and decorative products.
Ask which approvals apply to the proposed work at the property. Wall changes and altered utility systems can require review, while some finish work may have a narrower process. Identify the responsible authority and required inspection stages before the schedule is agreed. Start with Department of Buildings and confirm jurisdiction for the address.
If an association or building manager applies, check its review and access arrangements separately. Authority approval and building permission address different requirements. Keep the relevant records with the approved project scope.
Ask for the milestones that matter to your household: final selections, delivery, room disruption and reconnection. No single construction duration fits every kitchen or scope.
| Remodel scope | Estimated range |
|---|---|
| Minor / cosmetic | $15,000–$35,000 |
| Mid-range | $35,000–$75,500 |
| Major / high-end | $75,500–$151,000+ |
The available regional wage factor is 1.006, based on the average carpenter and plumber wage comparison in the supplied BLS data. It is a labor-planning proxy, not a local contractor price survey. The national bases are multiplied by the factor and rounded to the nearest $500. Final pricing follows an in-home consultation, actual conditions, agreed work and selected products.
$35,000–$75,500
Room-level estimate only. The full calculator also compares cabinets, surfaces, appliances and flooring.
Open the full estimator with your city selectedThis page uses a 1.006 planning factor. The result is a starting range, not a fixed price. Cabinet volume, product specifications, access and concealed conditions need assessment. The full estimator lets you compare additional choices before an in-home consultation.
Confirm the applicable process before construction. Finish work and service relocation can have different requirements. The relevant authority should determine which applications or inspections are needed for the property, and building rules should be checked where they apply.
No. Obtain the current rules for the actual property. They may affect noisy work, deliveries and interruptions. Scheduling should reflect verified building requirements rather than assumptions about the neighborhood. Discuss the detail alongside the related installation work.
They can add capacity, but the space must remain accessible and suit the room. Decide what will be stored high and how it will be reached. Cabinet volume alone does not measure everyday usefulness. Discuss the detail alongside the related installation work.
Potentially, if the sequence protects finished work and keeps later alterations practical. Repeated removal and reconnection can increase cost. Ask for a phase plan showing what remains usable and which tasks depend on one another. Keep the approved information with the final specifications.
The links below are the nearest available geocoded entries within the approved service list, using straight-line distances between place reference points. They are not driving times or a guarantee of project availability. Neighborhood and ZIP details are not supplied for this entry, so no additional local coverage is inferred.
See all approved District of Columbia communities or compare the state cost guide. Call to check your address and the proposed project.
Kitchen Remodeling Renovations has 30+ years in business and 1,000+ successfully completed projects. Have your location, approximate room size and main concerns ready.