Kitchen Renovation
A kitchen renovation that connects every decision.
Planning a kitchen renovation in Wellington? Review the existing room, desired result and budget before committing to cabinets, counters or a new layout.

Cabinets, counters, islands and lighting from recent kitchen projects. Swipe or use the arrows to browse more.
















Explore all 23 services, from cabinets and countertops to full remodels.
A kitchen renovation that connects every decision.
Change how the kitchen works, as well as how it looks.
A kitchen plan drawn around your daily routines.
Cabinetry planned for the storage you actually need.
New cabinet fronts, with a careful look at what stays.
A cabinet finish refresh with preparation at its center.
Quartz counters, fitted to the cabinets and the way you prepare food.
Select the slab, then plan how it fits the room.
An island that earns its place in the kitchen.
A backsplash planned around the details on the wall.
Kitchen flooring starts with what is underneath.
Light the work surfaces, then shape the room.
A sink and faucet that fit the opening and the routine.
Resolve the connections before closing in the kitchen.
Open the room only after understanding the wall.
A galley kitchen with a clear path through the work.
Make a small kitchen work harder, without crowding it.
A condo kitchen plan that includes the building.
A considered kitchen, with the details resolved together.
Spend first on the changes that solve the problem.
A kitchen designed around the person using it.
Plan the outdoor kitchen for its exposure and connections.
Confirm the fit and connections before delivery day.
The 2020–2024 ACS estimate for the matched housing area gives a median construction year of 1995. This is a community estimate, not the age of every home or a survey of kitchen condition.
If the existing kitchen already provides workable circulation, focus on the components that fall short. Better cabinet interiors or coordinated surfaces may be enough. Check the actual layout and condition before treating the building era as evidence that all utilities or cabinetry can stay.
The matched ACS building-type estimates are 83.60% single-family structures; 15.95% buildings with two or more housing units; 0.27% mobile/manufactured housing category. Building type does not identify ownership rules or confirm the construction of your property.
Housing context: U.S. Census ACS 2020–2024 five-year tables, matched to Wellington village, Florida. Estimates describe the mapped area, with sampling uncertainty.
Humid climate context makes moisture management worth including in the conversation. Inspect the actual sink area and ventilation arrangement. Choose cabinetry and finishes using their specifications; no material label alone guarantees protection from a leak or unsuitable installation.
The matched ACS median home value is $599,400, above the supplied state median of $359,000. These are housing-value estimates, not a remodeling return forecast. Review a higher-specification option alongside the simpler design that meets the same priorities. Include care and replacement access as well as appearance. The housing-value comparison offers context, while actual condition and household use should guide the selection.
These services can be provided by different parties and have different inclusions. Clarify removal of the old appliance, disposal, connection parts, alterations and commissioning. Keep the order and installation documents together. If a problem arises, the records help identify whether it concerns the product, delivery condition or site work.
Consider entering the kitchen, preparing food, sitting nearby and cleaning up at night. Decide which groups should operate together and which need independent control. Keep the arrangement understandable. Control compatibility and circuit requirements should be verified with the actual products rather than added as an assumption after fixture selection.
Write down the activities that are difficult in the current room. Is the preparation surface crowded, are pans hard to reach, or does an appliance door block the route through the kitchen? Those examples give the design a purpose. Separate essential repairs from optional finish changes so the proposed scope addresses the everyday problem first.
The room design does not establish permission to build. Check the actual scope with the relevant city or county authority, including structural and utility changes. Record any inspection points in the project sequence so finishes do not conceal work before required review. No address-specific department link is provided here; use the responsible local authority for your property.
If an association or building manager applies, check its review and access arrangements separately. Authority approval and building permission address different requirements. Keep the relevant records with the approved project scope.
Confirm a project-specific schedule with ordering, site work and kitchen downtime shown separately. Product availability, approved scope and property conditions determine the sequence.
| Remodel scope | Estimated range |
|---|---|
| Minor / cosmetic | $12,000–$28,000 |
| Mid-range | $28,000–$60,500 |
| Major / high-end | $60,500–$120,500+ |
The available regional wage factor is 0.805, based on the average carpenter and plumber wage comparison in the supplied BLS data. It is a labor-planning proxy, not a local contractor price survey. The national bases are multiplied by the factor and rounded to the nearest $500. Final pricing follows an in-home consultation, actual conditions, agreed work and selected products.
$28,000–$60,500
Room-level estimate only. The full calculator also compares cabinets, surfaces, appliances and flooring.
Open the full estimator with your city selectedThe displayed factor is 0.805. It adjusts national room-level scope ranges and does not price individual products or inspect the property. Use the mini calculator to compare size and layout, then discuss the actual condition and selected materials for a project-specific estimate.
Review approval requirements while the scope is being developed. A layout drawing does not establish permission to build. Identify the responsible local authority and any required inspection stages, then include them in the installation sequence.
It depends on the household. Openness can improve connection while removing wall storage and exposing cooking activity to adjoining rooms. Compare those effects against your priorities before deciding on structural work. Include the decision in the written project scope.
Cabinets should be installed and checked to the fabricator’s requirements, with appliance and sink information confirmed. Templating over a base that will move can lead to a fitted surface that no longer matches the room. Keep the approved information with the final specifications.
Inspect and document the issue through the actual supplier’s process before treating installation as complete. Confirm who resolves replacement and scheduling. Do not conceal delivery damage behind cabinetry or panels. Check this before the affected products are ordered.
The links below are the nearest available geocoded entries within the approved service list, using straight-line distances between place reference points. They are not driving times or a guarantee of project availability. Neighborhood and ZIP details are not supplied for this entry, so no additional local coverage is inferred.
See all approved Florida communities or compare the state cost guide. Call to check your address and the proposed project.
Kitchen Remodeling Renovations has 30+ years in business and 1,000+ successfully completed projects. Have your location, approximate room size and main concerns ready.