Kitchen Renovation
A kitchen renovation that connects every decision.
A kitchen project in Chevy Chase begins with your home and priorities. Compare focused improvements with a wider remodel using the available local context.

Cabinets, counters, islands and lighting from recent kitchen projects. Swipe or use the arrows to browse more.
















Explore all 23 services, from cabinets and countertops to full remodels.
A kitchen renovation that connects every decision.
Change how the kitchen works, as well as how it looks.
A kitchen plan drawn around your daily routines.
Cabinetry planned for the storage you actually need.
New cabinet fronts, with a careful look at what stays.
A cabinet finish refresh with preparation at its center.
Quartz counters, fitted to the cabinets and the way you prepare food.
Select the slab, then plan how it fits the room.
An island that earns its place in the kitchen.
A backsplash planned around the details on the wall.
Kitchen flooring starts with what is underneath.
Light the work surfaces, then shape the room.
A sink and faucet that fit the opening and the routine.
Resolve the connections before closing in the kitchen.
Open the room only after understanding the wall.
A galley kitchen with a clear path through the work.
Make a small kitchen work harder, without crowding it.
A condo kitchen plan that includes the building.
A considered kitchen, with the details resolved together.
Spend first on the changes that solve the problem.
A kitchen designed around the person using it.
Plan the outdoor kitchen for its exposure and connections.
Confirm the fit and connections before delivery day.
Housing age has not been reliably matched for this entry. The guidance below starts with your property and does not assign an unverified building history.
Begin with the actual room: measurements, photos, the condition of the cabinet boxes and the placement of appliances. No reliable housing-era estimate is attached to this location, so the plan should not assume older wiring, a particular layout or modern construction. A focused refresh and a complete renovation remain options to compare.
Open cabinets, look around the sink and check shelf and drawer support. Appropriate assessment can reveal damage that is not visible when the doors are shut. Repairable local damage and widespread deterioration lead to different choices. Price the required repairs with the refacing option rather than treating them as an unexpected addition after the new fronts have been ordered.
Representative work heights, controls and reach arrangements can be evaluated before custom components are made. Include the user’s ordinary equipment where relevant. Record the decisions and any remaining checks. This is more useful than relying entirely on a generic illustration or assuming another person’s accessible kitchen will suit the same needs.
Write down the activities that are difficult in the current room. Is the preparation surface crowded, are pans hard to reach, or does an appliance door block the route through the kitchen? Those examples give the design a purpose. Separate essential repairs from optional finish changes so the proposed scope addresses the everyday problem first.
Use the exact appliance specifications when checking the cabinet plan. Nominal size does not describe door movement, ventilation or connection requirements. A replacement that is almost the same size may still alter the surrounding work. Confirm models before dimensions are used for ordering or fitted surface fabrication.
Compare materials as installed assemblies. Cabinet interiors, exposed panels, countertop edges and wall transitions all contribute to the finished room. A lower product price may not mean a lower project total if preparation or associated work is greater. Ask for the complete scope and clearly stated exclusions.
Ask for a schedule with product decisions, site readiness and kitchen downtime shown separately. A delivery milestone is not the same as an operational room. Cabinet fitting, counter fabrication and fixture reconnection can depend on one another. Identify which late decisions would change the later stages.
Structural alterations and changes to electrical, plumbing or gas systems can involve permits and inspections. Requirements follow the actual address and scope. Confirm the responsible city or county building department before scheduling work; a cosmetic replacement may be treated differently from a relocation. No address-specific department link is provided here; use the responsible local authority for your property.
A condo or managed property may also have delivery, work-hour or shared-service arrangements. Confirm the actual rules before booking the work. Do not use a nearby building’s renovation as evidence of permission for your address.
A useful timeline identifies dependencies and the decisions needed before work begins. Separate preconstruction from the period without a functioning kitchen, and record changes as they arise.
| Remodel scope | Estimated range |
|---|---|
| Minor / cosmetic | $15,000–$35,000 |
| Mid-range | $35,000–$75,000 |
| Major / high-end | $75,000–$150,000+ |
No reliable area wage factor is attached to this entry. The table uses national assumptions at 1.000; it does not present an invented local price adjustment. The national bases are multiplied by the factor and rounded to the nearest $500. Final pricing follows an in-home consultation, actual conditions, agreed work and selected products.
$35,000–$75,000
Room-level estimate only. The full calculator also compares cabinets, surfaces, appliances and flooring.
Open the full estimator with your city selectedA factor of 1.000 is applied to the national bases. It cannot establish what your installation will cost. Compare the scope and retained components first, then obtain pricing against the property and products rather than treating the calculator as an offer.
Review approval requirements while the scope is being developed. A layout drawing does not establish permission to build. Identify the responsible local authority and any required inspection stages, then include them in the installation sequence.
Yes. Cabinet interiors, drawer configurations and a better arrangement of appliances can make existing space more useful. Compare accessible storage and working surfaces rather than counting cabinets alone. Check this before the affected products are ordered.
Choose them before ordering so drawer boxes, door openings and fittings work together. An accessory chosen later may not fit the selected cabinet or may interfere with utilities inside a sink base. Check this before the affected products are ordered.
Sometimes, after the box and drawer configuration are checked. Specify the actual fittings and any required modifications. A new front does not automatically make an old drawer compatible with every modern slide system. Check this before the affected products are ordered.
The location does not have a reliable geographic match. These links show other approved communities; they are not presented as nearest neighbors or travel distances. Neighborhood and ZIP details are not supplied for this entry, so no additional local coverage is inferred.
See all approved Maryland communities or compare the state cost guide. Call to check your address and the proposed project.
Kitchen Remodeling Renovations has 30+ years in business and 1,000+ successfully completed projects. Have your location, approximate room size and main concerns ready.