Kitchen Renovation
A kitchen renovation that connects every decision.
A kitchen project in Cedar begins with your home and priorities. Compare focused improvements with a wider remodel using the available local context.

Cabinets, counters, islands and lighting from recent kitchen projects. Swipe or use the arrows to browse more.
















Explore all 23 services, from cabinets and countertops to full remodels.
A kitchen renovation that connects every decision.
Change how the kitchen works, as well as how it looks.
A kitchen plan drawn around your daily routines.
Cabinetry planned for the storage you actually need.
New cabinet fronts, with a careful look at what stays.
A cabinet finish refresh with preparation at its center.
Quartz counters, fitted to the cabinets and the way you prepare food.
Select the slab, then plan how it fits the room.
An island that earns its place in the kitchen.
A backsplash planned around the details on the wall.
Kitchen flooring starts with what is underneath.
Light the work surfaces, then shape the room.
A sink and faucet that fit the opening and the routine.
Resolve the connections before closing in the kitchen.
Open the room only after understanding the wall.
A galley kitchen with a clear path through the work.
Make a small kitchen work harder, without crowding it.
A condo kitchen plan that includes the building.
A considered kitchen, with the details resolved together.
Spend first on the changes that solve the problem.
A kitchen designed around the person using it.
Plan the outdoor kitchen for its exposure and connections.
Confirm the fit and connections before delivery day.
Housing age has not been reliably matched for this entry. The guidance below starts with your property and does not assign an unverified building history.
Without a matched housing-age estimate, consider what the kitchen itself shows. Check storage access, preparation space and appliance fit before choosing materials. Existing condition and the desired result can define a sensible scope without making assumptions about neighborhood age, construction or utility systems.
Review cabinetry, surfaces, hardware and lighting as a composition. Establish the key alignments and finish relationships in the approved documents. Separate suppliers need a clear reference to coordinate their work. Without that, individually refined components can still meet awkwardly at the interfaces.
If the principal issue is dark preparation space, a lighting improvement may provide more benefit than a decorative counter. If cabinetry is failing, a surface update may be a temporary distraction. Rank the functional issues and attach each proposed expense to the problem it solves. This makes tradeoffs easier when the available funds cannot cover every preference.
Follow an ordinary meal through the room, from unloading groceries to washing dishes. Note where the arrangement slows you down and where more accessible storage would help. This gives a useful basis for comparing a surface refresh, cabinet replacement and a layout change instead of treating all three as the same project.
Measure the room and identify doors, windows, ceiling changes and fixed obstructions. Then add the real appliance openings and movement into the drawing. A plan based only on wall lengths can miss collisions between handles, drawers and an open dishwasher. Verify those interactions before the installation period starts.
Choose surfaces and finishes together where they meet. A counter can influence the backsplash height, flooring can affect appliance openings, and lighting can change how texture is perceived. Review those relationships with representative samples and product information before treating individual selections as final.
Plan the period without a working sink or cooking area separately from design and product ordering. Arrange temporary food storage and simple meal preparation outside the work zone. Confirm access through adjoining rooms and protection for existing finishes. These arrangements should match the actual sequence rather than a generic completion promise.
Structural alterations and changes to electrical, plumbing or gas systems can involve permits and inspections. Requirements follow the actual address and scope. Confirm the responsible city or county building department before scheduling work; a cosmetic replacement may be treated differently from a relocation. No address-specific department link is provided here; use the responsible local authority for your property.
If an association or building manager applies, check its review and access arrangements separately. Authority approval and building permission address different requirements. Keep the relevant records with the approved project scope.
A useful timeline identifies dependencies and the decisions needed before work begins. Separate preconstruction from the period without a functioning kitchen, and record changes as they arise.
| Remodel scope | Estimated range |
|---|---|
| Minor / cosmetic | $15,000–$35,000 |
| Mid-range | $35,000–$75,000 |
| Major / high-end | $75,000–$150,000+ |
No reliable area wage factor is attached to this entry. The table uses national assumptions at 1.000; it does not present an invented local price adjustment. The national bases are multiplied by the factor and rounded to the nearest $500. Final pricing follows an in-home consultation, actual conditions, agreed work and selected products.
$35,000–$75,000
Room-level estimate only. The full calculator also compares cabinets, surfaces, appliances and flooring.
Open the full estimator with your city selectedThe displayed factor is 1.000. It adjusts national room-level scope ranges and does not price individual products or inspect the property. Use the mini calculator to compare size and layout, then discuss the actual condition and selected materials for a project-specific estimate.
Confirm the applicable process before construction. Finish work and service relocation can have different requirements. The relevant authority should determine which applications or inspections are needed for the property, and building rules should be checked where they apply.
Potentially, if the sequence protects finished work and keeps later alterations practical. Repeated removal and reconnection can increase cost. Ask for a phase plan showing what remains usable and which tasks depend on one another. Check this before the affected products are ordered.
Do not assume it can be removed and refitted intact. The existing material, layout and support affect the options. Have the proposed reuse assessed before making it part of the cabinet replacement budget. Check this before the affected products are ordered.
Yes. Cabinet finishes, counters, hardware and lighting interact. A coordinated sample review helps identify differences that are less obvious when products are selected separately or from screen images. Discuss the detail alongside the related installation work.
The location does not have a reliable geographic match. These links show other approved communities; they are not presented as nearest neighbors or travel distances. Neighborhood and ZIP details are not supplied for this entry, so no additional local coverage is inferred.
See all approved Minnesota communities or compare the state cost guide. Call to check your address and the proposed project.
Kitchen Remodeling Renovations has 30+ years in business and 1,000+ successfully completed projects. Have your location, approximate room size and main concerns ready.