Kitchen Renovation
A kitchen renovation that connects every decision.
For homeowners in Colleyville, start with the practical change you need and compare the scope before choosing individual kitchen products.

Cabinets, counters, islands and lighting from recent kitchen projects. Swipe or use the arrows to browse more.
















Explore all 23 services, from cabinets and countertops to full remodels.
A kitchen renovation that connects every decision.
Change how the kitchen works, as well as how it looks.
A kitchen plan drawn around your daily routines.
Cabinetry planned for the storage you actually need.
New cabinet fronts, with a careful look at what stays.
A cabinet finish refresh with preparation at its center.
Quartz counters, fitted to the cabinets and the way you prepare food.
Select the slab, then plan how it fits the room.
An island that earns its place in the kitchen.
A backsplash planned around the details on the wall.
Kitchen flooring starts with what is underneath.
Light the work surfaces, then shape the room.
A sink and faucet that fit the opening and the routine.
Resolve the connections before closing in the kitchen.
Open the room only after understanding the wall.
A galley kitchen with a clear path through the work.
Make a small kitchen work harder, without crowding it.
A condo kitchen plan that includes the building.
A considered kitchen, with the details resolved together.
Spend first on the changes that solve the problem.
A kitchen designed around the person using it.
Plan the outdoor kitchen for its exposure and connections.
Confirm the fit and connections before delivery day.
The 2020–2024 ACS estimate for the matched housing area gives a median construction year of 1994. This is a community estimate, not the age of every home or a survey of kitchen condition.
A later housing era can make an in-place upgrade worth comparing, but it does not establish the condition of the kitchen. Review the island, storage and appliance positions if present. Counters, lighting or interior fittings may improve a useful room without a wider layout change.
The matched ACS building-type estimates are 98.40% single-family structures; 1.33% buildings with two or more housing units; 0.13% mobile/manufactured housing category. Building type does not identify ownership rules or confirm the construction of your property.
Housing context: U.S. Census ACS 2020–2024 five-year tables, matched to Colleyville city, Texas. Estimates describe the mapped area, with sampling uncertainty.
For the humid county climate shown in the available data, discuss ventilation and surface exposure alongside finishes. Cabinet construction, joints and actual water sources matter. Assess the property before attributing any mold or damage to climate.
The matched ACS median home value is $784,900, above the supplied state median of $283,800. These are housing-value estimates, not a remodeling return forecast. Evaluate specialty cabinetry, appliance integration and detailed finishes against their daily benefit and maintenance. Standard products may meet the same functional brief. An above-state housing median does not establish the price of your home or justify a particular specification.
Plan where chilled food, drinking water and simple meals will be handled while the room is unavailable. Identify which appliances can be used outside the work zone and discuss safe arrangements with the project team. Keep essential utensils separate before the room is cleared. Daily access needs should be considered alongside construction logistics, particularly where the kitchen is also the route to another part of the home.
Review cabinetry, surfaces, hardware and lighting as a composition. Establish the key alignments and finish relationships in the approved documents. Separate suppliers need a clear reference to coordinate their work. Without that, individually refined components can still meet awkwardly at the interfaces.
Write down the activities that are difficult in the current room. Is the preparation surface crowded, are pans hard to reach, or does an appliance door block the route through the kitchen? Those examples give the design a purpose. Separate essential repairs from optional finish changes so the proposed scope addresses the everyday problem first.
The room design does not establish permission to build. Check the actual scope with the relevant city or county authority, including structural and utility changes. Record any inspection points in the project sequence so finishes do not conceal work before required review. No address-specific department link is provided here; use the responsible local authority for your property.
A condo or managed property may also have delivery, work-hour or shared-service arrangements. Confirm the actual rules before booking the work. Do not use a nearby building’s renovation as evidence of permission for your address.
Confirm a project-specific schedule with ordering, site work and kitchen downtime shown separately. Product availability, approved scope and property conditions determine the sequence.
| Remodel scope | Estimated range |
|---|---|
| Minor / cosmetic | $12,500–$29,500 |
| Mid-range | $29,500–$63,000 |
| Major / high-end | $63,000–$126,500+ |
The available regional wage factor is 0.842, based on the average carpenter and plumber wage comparison in the supplied BLS data. It is a labor-planning proxy, not a local contractor price survey. The national bases are multiplied by the factor and rounded to the nearest $500. Final pricing follows an in-home consultation, actual conditions, agreed work and selected products.
$29,500–$63,000
Room-level estimate only. The full calculator also compares cabinets, surfaces, appliances and flooring.
Open the full estimator with your city selectedA factor of 0.842 is applied to the national bases. It cannot establish what your installation will cost. Compare the scope and retained components first, then obtain pricing against the property and products rather than treating the calculator as an offer.
Confirm the applicable process before construction. Finish work and service relocation can have different requirements. The relevant authority should determine which applications or inspections are needed for the property, and building rules should be checked where they apply.
Before final cabinet and utility decisions. Model specifications determine openings, clearances and connections. A late substitution can affect several parts of the room even when its advertised width appears similar. Keep the approved information with the final specifications.
Inclusions vary. Ask the estimate to list hardware, fillers, finished panels, toe kicks and trim along with boxes and fronts. Those components influence both the finished appearance and the complete installed price. Check this before the affected products are ordered.
Discuss access, dust protection, utility interruptions and temporary meal preparation for the actual project. Remaining at home may be practical for some scopes, but the kitchen can be unavailable and the arrangement needs to be planned. Include the decision in the written project scope.
The links below are the nearest available geocoded entries within the approved service list, using straight-line distances between place reference points. They are not driving times or a guarantee of project availability. Neighborhood and ZIP details are not supplied for this entry, so no additional local coverage is inferred.
See all approved Texas communities or compare the state cost guide. Call to check your address and the proposed project.
Kitchen Remodeling Renovations has 30+ years in business and 1,000+ successfully completed projects. Have your location, approximate room size and main concerns ready.