Kitchen Renovation
A kitchen renovation that connects every decision.
Serving The Colony with kitchen renovation planning around the room you have: its storage, working layout and the components worth keeping.

Cabinets, counters, islands and lighting from recent kitchen projects. Swipe or use the arrows to browse more.
















Explore all 23 services, from cabinets and countertops to full remodels.
A kitchen renovation that connects every decision.
Change how the kitchen works, as well as how it looks.
A kitchen plan drawn around your daily routines.
Cabinetry planned for the storage you actually need.
New cabinet fronts, with a careful look at what stays.
A cabinet finish refresh with preparation at its center.
Quartz counters, fitted to the cabinets and the way you prepare food.
Select the slab, then plan how it fits the room.
An island that earns its place in the kitchen.
A backsplash planned around the details on the wall.
Kitchen flooring starts with what is underneath.
Light the work surfaces, then shape the room.
A sink and faucet that fit the opening and the routine.
Resolve the connections before closing in the kitchen.
Open the room only after understanding the wall.
A galley kitchen with a clear path through the work.
Make a small kitchen work harder, without crowding it.
A condo kitchen plan that includes the building.
A considered kitchen, with the details resolved together.
Spend first on the changes that solve the problem.
A kitchen designed around the person using it.
Plan the outdoor kitchen for its exposure and connections.
Confirm the fit and connections before delivery day.
The 2020–2024 ACS estimate for the matched housing area gives a median construction year of 2001. This is a community estimate, not the age of every home or a survey of kitchen condition.
If the existing kitchen already provides workable circulation, focus on the components that fall short. Better cabinet interiors or coordinated surfaces may be enough. Check the actual layout and condition before treating the building era as evidence that all utilities or cabinetry can stay.
The matched ACS building-type estimates are 73.50% single-family structures; 26.22% buildings with two or more housing units; 0.28% mobile/manufactured housing category. Building type does not identify ownership rules or confirm the construction of your property.
Housing context: U.S. Census ACS 2020–2024 five-year tables, matched to The Colony city, Texas. Estimates describe the mapped area, with sampling uncertainty.
For the humid county climate shown in the available data, discuss ventilation and surface exposure alongside finishes. Cabinet construction, joints and actual water sources matter. Assess the property before attributing any mold or damage to climate.
The matched ACS median home value is $383,900, above the supplied state median of $283,800. These are housing-value estimates, not a remodeling return forecast. Compare custom storage and premium finishes with a well-specified standard arrangement. Their practical benefit should justify the added scope. Higher area housing value does not guarantee a remodeling return or mean every component needs to be upgraded.
A painting estimate should explain cleaning, repair, surface preparation and the areas receiving coatings. It should also state the expected application result and protection arrangements. Two prices based on different preparation are not directly comparable. If a heavily damaged or incompatible surface requires substantial correction, compare that work with replacement fronts before deciding that painting is the simpler option.
Doorways and room entries influence how the galley handles traffic. Extra storage near an opening can narrow the approach or obstruct an appliance door. Review the route into adjoining rooms and identify which spaces must stay clear. This is particularly important where the kitchen doubles as a passage rather than a destination.
Start with how the household cooks, stores food and cleans up. Identify the points where those activities conflict and the components that still work. A new finish can change the appearance without resolving poor access. Put the functional priorities into the brief before comparing cabinet styles and decorative products.
The room design does not establish permission to build. Check the actual scope with the relevant city or county authority, including structural and utility changes. Record any inspection points in the project sequence so finishes do not conceal work before required review. No address-specific department link is provided here; use the responsible local authority for your property.
Include any required applications, inspections and access arrangements in the timeline. Assign responsibility for each item clearly. A finished material selection is separate from the approval and readiness needed to install it.
Confirm a project-specific schedule with ordering, site work and kitchen downtime shown separately. Product availability, approved scope and property conditions determine the sequence.
| Remodel scope | Estimated range |
|---|---|
| Minor / cosmetic | $12,500–$29,500 |
| Mid-range | $29,500–$63,000 |
| Major / high-end | $63,000–$126,500+ |
The available regional wage factor is 0.842, based on the average carpenter and plumber wage comparison in the supplied BLS data. It is a labor-planning proxy, not a local contractor price survey. The national bases are multiplied by the factor and rounded to the nearest $500. Final pricing follows an in-home consultation, actual conditions, agreed work and selected products.
$29,500–$63,000
Room-level estimate only. The full calculator also compares cabinets, surfaces, appliances and flooring.
Open the full estimator with your city selectedThe displayed factor is 0.842. It adjusts national room-level scope ranges and does not price individual products or inspect the property. Use the mini calculator to compare size and layout, then discuss the actual condition and selected materials for a project-specific estimate.
Review approval requirements while the scope is being developed. A layout drawing does not establish permission to build. Identify the responsible local authority and any required inspection stages, then include them in the installation sequence.
Before final cabinet and utility decisions. Model specifications determine openings, clearances and connections. A late substitution can affect several parts of the room even when its advertised width appears similar. Check this before the affected products are ordered.
Cabinets should be installed and checked to the fabricator’s requirements, with appliance and sink information confirmed. Templating over a base that will move can lead to a fitted surface that no longer matches the room. Include the decision in the written project scope.
For work disturbing painted surfaces in pre-1978 housing, review the applicable EPA lead-safe renovation requirements before preparation. This is a project assessment question, not evidence that a particular cabinet contains lead. Keep the approved information with the final specifications.
The links below are the nearest available geocoded entries within the approved service list, using straight-line distances between place reference points. They are not driving times or a guarantee of project availability. Neighborhood and ZIP details are not supplied for this entry, so no additional local coverage is inferred.
See all approved Texas communities or compare the state cost guide. Call to check your address and the proposed project.
Kitchen Remodeling Renovations has 30+ years in business and 1,000+ successfully completed projects. Have your location, approximate room size and main concerns ready.